# RUN REPORT: Turkey, Texas, step 3 engine (local OSM store, RoadAuthority, NLCD pavement, NHD and FRA crossings)

Run 2026-10-03T14:37:09.  Code `engine\` (`run_project.py turkey`), outputs `_Working\runs\turkey\`.  Total wall time 32.75 s before the screenshot.

## Rates in use: this project's overrides from the bid workbook

- Overrides file `engine\projects\turkey\assumptions_overrides.json`, existing file kept (pass --rebuild-overrides to regenerate from the bid).  Source: `BID CALC - HYPERLINK-ROCKPORT - QTS - TURKEY TEXAS - v2026.08.31.Final.xlsx`, sheet `CONSTRUCTION LABOR BID`, unit cost block (header row 257), segment 1 (column H: TURKEY - S. CAV to LUBBOCK).
- Base rate (bore class 2 dirt) $12.00 per ft (template default $12.00).  Rates the bid left blank fall back to the default multiple times this base: bore class 7: default multiple 5.0000 x $12.00 = $60.00; bore class 8: default multiple 16.6667 x $12.00 = $200.00; bore class 9: default multiple 37.5000 x $12.00 = $450.00; crossing tier2: default multiple 14.5833 x $12.00 = $175.00; crossing tier3: default multiple 6.2500 x $12.00 = $75.00.

| Rate | This project (bid) | Template default |
|:--|--:|--:|
| Bore class 1 | $12.00 | $12.00 |
| Bore class 2 | $12.00 | $12.00 |
| Bore class 3 | $12.00 | $12.00 |
| Bore class 4 | $18.00 | $20.00 |
| Bore class 5 | $30.00 | $30.00 |
| Bore class 6 | $40.00 | $45.00 |
| Bore class 7 | $60.00 | $60.00 |
| Bore class 8 | $200.00 | $200.00 |
| Bore class 9 | $450.00 | $450.00 |
| Trench class 1 | $5.00 | $5.50 |
| Trench class 2 | $5.00 | $5.50 |
| Trench class 3 | $5.00 | $10.00 |
| Trench class 4 | $10.00 | $15.00 |
| Trench class 5 | $15.00 | $20.00 |
| Trench class 6 | $17.50 | $25.00 |
| Trench class 7 | $20.00 | $35.00 |
| Crossing tier1 | $70.00 | $360.00 |
| Crossing tier2 | $175.00 | $175.00 |
| Crossing tier3 | $75.00 | $75.00 |

## A and Z

- Source: `Example - Turkey\route KMZ - v2026.08.31a.kmz`, KMZ line 'Turkey Route' (1 lines in the file; selected by longest); A = first vertex of the line as drawn.
- A (lon, lat) = (-101.851695, 33.581172) (A Lubbock end).  Z = (-100.897888, 34.327051) (Z Turkey end).
- Human route length from the KMZ: 562,013 ft = 106.44 mi (626 vertices, geodesic).  Bid footage for this segment: 562,013 ft (`CONSTRUCTION LABOR BID!H94`).
- Snapped to graph nodes 226906653 (172 ft away) and 225082641 (2807 ft away).

## Corridor graph (local Geofabrik store, no Overpass)

- bbox (left, bottom, right, top) = (-102.06084, 33.40726, -100.68875, 34.50096), pad 12 mi, network drive, source pickle cache of local Geofabrik store (osm_store.py).
- Store read: 47,019 ways from TX in 1.46 s, 17,409 after de-duplication and the drive filter; graph build (chain merge on OSM node ids, split on highway, bridge, toll) 4.58 s: 167,700 segments and 154,089 nodes in the bbox to 28,957 nodes and 42,289 edges; **corridor total 6.41 s** (store timestamps {'TX': '2026-09-20T20:22:06Z'}).
- Routing graph 28,756 nodes, 42,138 edges, 11,681 road miles; bridge edges 345, toll edges 0.

## Incorporated places

- `Places_Incorporated_2025` (EPSG:26914), 26 places in the bbox, read in 0.04 s: Abernathy city, Buffalo Springs Lake village, Crosbyton city, Dickens city, Edmonson town, Floydada city, Hale Center city, Idalou city, Kress city, Lockney town, Lorenzo city, Lubbock city, Matador town, New Deal town, Petersburg city, Plainview city, Quitaque city, Ralls city, Ransom Canyon town, Roaring Springs town, Shallowater city, Silverton city, Slaton city, Spur city, Turkey city, Wolfforth city.
- 26,442 of 42,138 edges (22.1% of corridor footage) are inside a place (midpoint test, 1.18 s).  Top: Lubbock city 9,590,301 ft, Plainview city 983,793 ft, Slaton city 441,464 ft, Wolfforth city 367,973 ft, Abernathy city 259,167 ft, Floydada city 209,712 ft.

## Soils

- 42,138 edges, 1,254,760 sample points every 50 ft, one window read of `CONUS_soilbid9_10m.tif` ([12901, 13222], 170.6 MB) in 0.16 s.  Corridor share by class: 1 0.4%, 2 92.4%, 3 5.8%, 4 0.7%, 5 0.2%, 6 0.1%, 12 0.3%.

## Pavement (new, Annual NLCD Fractional Impervious Surface 2025)

- `Annual_NLCD_FctImp_2025_CU_C1V2.tif`: 30 m percent impervious, window [4311, 4418] (19.0 MB) read in 0.04 s over the same 1,254,760 sample points; 0 nodata samples treated as 0 percent.
- The percent used is the mean of a 11 by 11 cell box (150 m each side of the sample, 0.16 s), not the cell under the road: the road's own cell reads 10 to 40 percent on any paved highway.  Corridor footage by bin, neighborhood: rural 74.6%, suburban 14.6%, urban 10.0%, dense 0.8%; by the raw centerline cell it would have been rural 32.6%, suburban 52.5%, urban 12.4%, dense 2.6%.  Edges whose neighborhood mean is 10 percent or more: 27,908 of 42,138 (centerline cell: 34,902).
- Used twice: the metro multiplier per edge is the footage-weighted mix of bin multipliers (rural 1.0, suburban 1.05, urban 1.2, dense 1.5, placeholders until step 4), and the not-bore rule now requires the edge mean under 10 percent.  Trench allowed on 73.0% of corridor footage under `place_pavement_soil`.

## Permitting authority (new, FiberBid RoadAuthority join)

- `RoadAuthority` bbox read: 22,325 HPMS 2024 segments in 12.46 s; classes {'state_dot': 8369, 'municipal': 8093, 'county': 5742, 'unknown': 121}; confidence {'rule_verified': 16462, 'inferred': 5742, 'unknown': 121}.
- Join: nearest segment within 30 m at 25, 50 and 75 percent of each edge; **35,329 of 42,138 edges matched, 83.1% of footage** (3.85 s).  Unmatched footage takes municipal inside a place, else county.
- Corridor footage by permit class: county 38,351,723 ft, municipal 10,793,765 ft, state_dot 10,694,163 ft, interstate 1,836,518 ft.
- Top authorities by footage: Hale County 6,522,776 ft, Lubbock city 6,286,300 ft, Lubbock County 5,560,463 ft, Floyd County 5,098,575 ft, Crosby County 3,561,525 ft, Swisher County 2,377,519 ft, Dickens County 1,690,393 ft, Briscoe County 1,514,406 ft.

## Crossings (new: NHD water, FRA rail, FEMA floodway, USACE navigable)

- NHD (TX): 3,686 water polygons ({'LakePond': 2524, 'Reservoir': 1158, 'StreamRiver': 4}) and 14,340 flowlines ({'intermittent': 10922, 'artificial path': 2709, 'perennial': 673, 'canal/ditch': 36}) in the bbox, read in 0.82 s.
- FRA grade crossings in the bbox: 324 ({'At Grade': 298, 'RR Under': 16, 'RR Over': 10}).  FEMA floodway polygons: 3 of 3,047 flood zone polygons.  USACE navigable waterway links: 0.
- Detection on all 42,138 edges in 0.55 s: crossings by kind {'water': 93, 'dry_bridge': 310, 'rail': 281}; edges with a crossing 674; edges with only minor (intermittent, ephemeral, canal) flowline hits and no bridge, counted but not tiered: 920; floodway edges 124, navigable edges 0, rail-over-road flags 8.
- Rules (assumptions `crossings`): polygon water on the edge: length = intersection ft (a bridge edge uses at least its own length); else a bridge edge over any flowline: length = bridge edge length; else a perennial flowline with no bridge: no_bridge_perennial_ft; minor (intermittent, ephemeral, canal) flowlines with no bridge are counted and flagged, not tiered, unless tier_minor_without_bridge is true.  Rail: At Grade: rail crossing of at_grade_ft on the nearest edge within join_max_m; RR Under (road bridge over rail): rail crossing of rr_under_ft (the bore under the tracks and the embankment, not the whole bridge; a 776 ft overpass at FM 1788 near Midland priced as Tier 2 rail before this, 2026-09-21); RR Over (rail bridge over the road): flag only.  Forced Tier 1: a water crossing within navigable_within_m of the USACE navigable waterway network is Tier 1 at any length (the Corps Section 10 rule). A water crossing on an edge inside a FEMA floodway polygon is Tier 1 when it is a real crossing of the floodway stream: polygon water or a bridge, at least floodway_min_ft long. A culvert-class default crossing of a side creek inside a wide floodway keeps its own tier (Ohio River bottoms finding, 2026-09-21).
- Priced at a tier across the whole graph: {'tier3': 381, 'tier2': 28, 'tier1': 9} by tier, {'water': 93, 'rail': 281, 'dry': 44} by kind.

## GeoTel carrier routes

- 11,333 features in the bbox in 0.12 s.  Named carriers found: AT&T, COGENT, FIBERLIGHT, LUMEN, MOX, SEGRA, UNITI, ZAYO; not present: VERIZON, ARELION, CROWN CASTLE.
- Corridor shared footage (within 250 ft of a named carrier): 10,716,519 ft (17.4%); by carrier AT&T 4,140,040 ft, UNITI 3,160,526 ft, LUMEN 2,612,747 ft, MOX 2,382,335 ft, FIBERLIGHT 2,327,466 ft, SEGRA 1,539,239 ft, ZAYO 1,294,045 ft, COGENT 1,199,343 ft.

## Timings (seconds)

| Step | Seconds |
|:--|--:|
| Assumptions build | 1.19 |
| Corridor total (store read plus graph build, or pickle load) | 0.87 |
| Places total | 1.26 |
| Soils total | 1.4 |
| Pavement total | 0.84 |
| Road authority total | 16.4 |
| Crossings total | 2.56 |
| Carriers total | 4.55 |
| Pricing | 0.36 |
| Spread (all solves and bookkeeping) | 1.75 |
| Dijkstra solves only | 1.728 |
| Route diversity | 0.032 |
| Shared segments | 0.11 |
| Comparison (human route) | 0.88 |
| Outputs (KMZ, HTML) | 0.39 |
| Total before the screenshot | 32.75 |

## Kept routes

Spread settings: penalty 1.3, overlap max 0.7, detour cap 1.35 times the shortest kept, max 20 routes, max 60 iterations.  21 solves, 20 kept, 0 pruned by the final cap.  R01 is the cheapest kept route.  Dollars are at this project's rates.

| Route | Miles | Dollars | $/ft | Diversity % | Shared ft | Longest shared run ft | Carriers (ft within 250 ft) | Crossing $ | Tiered crossings (water, rail, dry) | Tier 1 | Worst crossing | Permit $ | Trench ft | Bore ft | Metro ft | Inside place ft | county ft | state_dot ft | municipal ft | interstate ft | Overlap vs R01 | unclassified mi | residential mi | secondary mi | primary mi | tertiary mi | trunk mi | motorway mi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| R01 | 97.60 | $3,350,327 | 6.50 | 66.9% | 170,535 | 77,364 | UNITI 114,062; ZAYO 100,931; LUMEN 96,967; MOX 41,359; COGENT 31,510; FIBERLIGHT 29,244; AT&T 8,524; SEGRA 1,349 | $0 | 0 (0, 0, 0) | 0 | none | $111,349 | 452,655 | 62,653 | 106,481 | 45,602 | 205,901 | 278,530 | 30,878 | 0 | 100.0% | 15.4 | 16.5 | 29.8 | 27.9 | 0.8 | 7.2 | 0.0 |
| R02 | 101.89 | $3,370,638 | 6.27 | 76.8% | 125,054 | 80,542 | FIBERLIGHT 81,039; LUMEN 39,730; UNITI 38,157; ZAYO 35,867; COGENT 27,496; AT&T 13,659; MOX 9,654; SEGRA 1,468 | $115,921 | 1 (1, 0, 0) | 0 | Tier 2 water 662 ft Quitaque Creek; intermittent on Farm-to-Market Road 599 $115,921 | $100,908 | 502,014 | 35,969 | 60,762 | 34,297 | 304,942 | 198,808 | 29,254 | 4,979 | 12.9% | 41.1 | 17.4 | 27.8 | 3.0 | 8.6 | 3.0 | 0.9 |
| R03 | 103.13 | $3,264,106 | 5.99 | 84.7% | 83,545 | 39,957 | UNITI 70,139; MOX 58,992; COGENT 47,818; FIBERLIGHT 45,236; LUMEN 25,611; ZAYO 15,851; AT&T 8,727; SEGRA 8,546 | $0 | 0 (0, 0, 0) | 0 | none | $71,051 | 497,619 | 46,905 | 62,333 | 34,677 | 356,466 | 163,669 | 24,389 | 0 | 8.0% | 32.7 | 25.8 | 7.3 | 19.7 | 6.8 | 10.8 | 0.0 |
| R04 | 102.97 | $3,465,505 | 6.37 | 86.2% | 74,862 | 26,385 | COGENT 27,405; UNITI 23,372; AT&T 22,763; MOX 13,618; FIBERLIGHT 10,194; LUMEN 9,218; ZAYO 7,608; SEGRA 3,755 | $142,388 | 3 (2, 1, 0) | 0 | Tier 2 water 616 ft Los Lingos Creek on Farm to Market Road 1065 $107,722 | $74,639 | 496,891 | 46,799 | 53,752 | 36,280 | 360,373 | 151,619 | 31,402 | 297 | 0.0% | 52.9 | 15.2 | 26.5 | 0.5 | 5.5 | 2.3 | 0.0 |
| R05 | 105.92 | $3,246,558 | 5.81 | 90.6% | 52,711 | 31,712 | UNITI 42,771; SEGRA 40,477; LUMEN 35,633; COGENT 9,267; MOX 9,267; AT&T 4,301; FIBERLIGHT 3,816; ZAYO 1,493 | $0 | 0 (0, 0, 0) | 0 | none | $97,161 | 530,122 | 29,139 | 48,020 | 21,037 | 277,595 | 262,136 | 19,080 | 450 | 7.1% | 21.1 | 30.8 | 18.6 | 19.4 | 14.4 | 1.7 | 0.0 |
| R06 | 105.45 | $3,436,193 | 6.17 | 90.1% | 55,144 | 19,174 | FIBERLIGHT 25,942; UNITI 21,176; ZAYO 19,698; LUMEN 14,592; AT&T 8,228; SEGRA 3,446; COGENT 510; MOX 509 | $115,921 | 1 (1, 0, 0) | 0 | Tier 2 water 662 ft Quitaque Creek; intermittent on Farm-to-Market Road 599 $115,921 | $53,114 | 515,960 | 40,811 | 51,216 | 29,004 | 418,316 | 119,159 | 19,296 | 0 | 10.3% | 58.3 | 22.4 | 16.9 | 1.6 | 6.3 | 0.0 | 0.0 |
| R07 | 106.58 | $3,468,800 | 6.16 | 93.0% | 39,497 | 12,044 | LUMEN 27,000; UNITI 25,216; ZAYO 21,198; MOX 12,207; FIBERLIGHT 11,216; AT&T 8,919; SEGRA 3,120; COGENT 1,462 | $123,421 | 2 (2, 0, 0) | 0 | Tier 2 water 662 ft Quitaque Creek; intermittent on Farm-to-Market Road 599 $115,921 | $63,416 | 525,188 | 37,572 | 53,280 | 34,337 | 448,636 | 85,205 | 23,289 | 5,632 | 4.1% | 65.7 | 20.0 | 11.6 | 0.7 | 4.7 | 2.9 | 1.1 |
| R08 | 106.61 | $3,486,332 | 6.19 | 84.9% | 84,756 | 29,462 | COGENT 39,288; UNITI 27,821; LUMEN 25,391; MOX 25,295; ZAYO 16,374; AT&T 11,603; FIBERLIGHT 11,570; SEGRA 9,390 | $107,722 | 1 (1, 0, 0) | 0 | Tier 2 water 616 ft Los Lingos Creek on Farm to Market Road 1065 $107,722 | $67,711 | 515,506 | 47,399 | 76,293 | 35,387 | 403,405 | 128,151 | 30,850 | 500 | 1.4% | 57.9 | 16.9 | 17.7 | 6.5 | 2.9 | 4.8 | 0.0 |
| R09 | 108.30 | $3,539,545 | 6.19 | 58.6% | 236,674 | 72,764 | UNITI 146,064; LUMEN 126,972; ZAYO 105,107; MOX 55,571; COGENT 52,452; FIBERLIGHT 26,000; AT&T 20,424; SEGRA 3,001 | $0 | 0 (0, 0, 0) | 0 | none | $91,634 | 525,043 | 46,781 | 136,005 | 38,636 | 340,377 | 195,488 | 35,663 | 297 | 9.3% | 42.8 | 15.6 | 7.4 | 29.5 | 2.8 | 10.2 | 0.0 |
| R10 | 108.41 | $3,586,865 | 6.27 | 89.9% | 58,057 | 23,853 | LUMEN 27,787; MOX 26,024; AT&T 24,883; UNITI 12,768; ZAYO 11,307; SEGRA 7,068; FIBERLIGHT 6,727; COGENT 581 | $122,722 | 2 (1, 1, 0) | 0 | Tier 2 water 616 ft Los Lingos Creek on Farm to Market Road 1065 $107,722 | $58,132 | 521,639 | 50,755 | 55,631 | 45,311 | 411,477 | 144,490 | 16,428 | 0 | 0.0% | 61.5 | 17.7 | 22.1 | 3.3 | 3.8 | 0.0 | 0.0 |
| R11 | 108.12 | $3,767,163 | 6.60 | 82.4% | 100,215 | 40,776 | UNITI 49,744; LUMEN 38,042; ZAYO 34,392; MOX 30,813; FIBERLIGHT 25,102; COGENT 20,601; AT&T 10,306; SEGRA 7,789 | $214,219 | 3 (2, 1, 0) | 0 | Tier 2 water 616 ft Los Lingos Creek on Farm to Market Road 1065 $107,722 | $105,522 | 512,828 | 58,051 | 75,908 | 46,127 | 373,956 | 155,181 | 31,553 | 10,190 | 8.0% | 61.4 | 7.9 | 26.0 | 1.4 | 4.3 | 5.2 | 1.8 |
| R12 | 110.65 | $3,636,722 | 6.23 | 74.5% | 149,211 | 90,571 | COGENT 90,571; MOX 90,323; UNITI 68,691; FIBERLIGHT 46,713; LUMEN 43,639; SEGRA 34,180; AT&T 5,897; ZAYO 4,792 | $106,107 | 3 (1, 0, 2) | 0 | Tier 3 dry 653 ft bridge over a minor flowline (Middle Pease River) on TX 70 $48,985 | $95,091 | 529,737 | 54,469 | 87,835 | 36,086 | 300,973 | 266,365 | 16,869 | 0 | 6.8% | 3.6 | 38.7 | 10.2 | 39.7 | 1.4 | 17.0 | 0.0 |
| R13 | 110.18 | $3,873,709 | 6.66 | 85.7% | 83,245 | 60,021 | AT&T 55,622; MOX 16,378; SEGRA 9,759; UNITI 8,529; LUMEN 8,035; FIBERLIGHT 7,900; ZAYO 5,761; COGENT 498 | $115,222 | 2 (1, 1, 0) | 0 | Tier 2 water 616 ft Los Lingos Creek on Farm to Market Road 1065 $107,722 | $91,449 | 502,243 | 79,481 | 91,915 | 64,918 | 358,921 | 183,241 | 39,148 | 414 | 1.4% | 46.7 | 24.9 | 26.9 | 5.8 | 6.0 | 0.0 | 0.0 |
| R14 | 113.08 | $3,998,713 | 6.70 | 86.7% | 79,208 | 27,141 | LUMEN 56,846; UNITI 40,206; ZAYO 38,204; MOX 27,141; SEGRA 11,164; AT&T 9,472; FIBERLIGHT 8,105; COGENT 1,413 | $206,719 | 3 (2, 1, 0) | 0 | Tier 2 water 616 ft Los Lingos Creek on Farm to Market Road 1065 $107,722 | $115,044 | 526,621 | 70,424 | 104,270 | 66,937 | 313,911 | 254,679 | 22,249 | 6,205 | 5.7% | 41.9 | 20.2 | 30.6 | 12.3 | 7.0 | 0.0 | 1.1 |
| R15 | 117.25 | $3,676,054 | 5.94 | 91.7% | 51,116 | 32,861 | UNITI 24,038; FIBERLIGHT 21,366; AT&T 21,182; LUMEN 14,440; COGENT 12,054; ZAYO 12,007; SEGRA 9,159; MOX 4,608 | $7,500 | 1 (0, 1, 0) | 0 | Tier 3 rail 100 ft BNSF railroad at AVENUE P (FRA 014932M) on Avenue P $7,500 | $69,953 | 570,173 | 48,930 | 51,980 | 46,011 | 441,210 | 151,510 | 26,023 | 360 | 0.0% | 52.3 | 35.1 | 15.9 | 12.8 | 1.1 | 0.0 | 0.0 |
| R16 | 116.92 | $3,791,371 | 6.14 | 93.1% | 42,423 | 31,657 | UNITI 32,213; MOX 31,558; COGENT 31,507; FIBERLIGHT 30,532; AT&T 6,740; LUMEN 4,570; SEGRA 2,038; ZAYO 1,477 | $180,135 | 3 (1, 1, 1) | 0 | Tier 2 water 662 ft Quitaque Creek; intermittent on Farm-to-Market Road 599 $115,921 | $67,433 | 569,811 | 47,525 | 59,325 | 34,328 | 435,229 | 160,771 | 21,335 | 0 | 1.2% | 50.1 | 29.7 | 16.1 | 0.5 | 14.7 | 5.9 | 0.0 |
| R17 | 119.91 | $3,705,428 | 5.85 | 87.2% | 81,330 | 42,490 | FIBERLIGHT 45,524; AT&T 44,016; UNITI 33,085; SEGRA 7,354; COGENT 5,780; LUMEN 1,006; MOX 514; ZAYO 485 | $15,000 | 1 (0, 1, 0) | 0 | Tier 3 rail 200 ft BNSF railroad at COUNTY ROAD 5300 (FRA 017339T) on County Road 5300 $15,000 | $72,003 | 589,239 | 43,865 | 86,058 | 39,699 | 413,122 | 209,968 | 10,014 | 0 | 0.0% | 42.3 | 33.9 | 16.3 | 23.7 | 3.7 | 0.0 | 0.0 |
| R18 | 117.43 | $4,026,892 | 6.49 | 74.4% | 158,957 | 72,764 | LUMEN 103,377; ZAYO 102,432; UNITI 89,060; COGENT 41,904; MOX 41,904; FIBERLIGHT 35,881; AT&T 10,891; SEGRA 1,026 | $48,164 | 5 (2, 3, 0) | 0 | Tier 3 water 181 ft White River on US Highway 82 $13,611 | $101,927 | 577,369 | 42,646 | 122,410 | 40,284 | 334,987 | 259,334 | 25,218 | 477 | 6.5% | 21.4 | 33.5 | 24.0 | 22.9 | 7.7 | 7.8 | 0.0 |
| R19 | 123.20 | $4,068,865 | 6.26 | 86.9% | 84,890 | 45,266 | COGENT 45,763; LUMEN 30,568; MOX 27,959; AT&T 11,286; UNITI 8,260; FIBERLIGHT 7,543; ZAYO 6,033; SEGRA 4,425 | $0 | 0 (0, 0, 0) | 0 | none | $177,768 | 587,209 | 63,282 | 86,903 | 58,707 | 407,718 | 189,693 | 18,276 | 34,804 | 0.0% | 52.0 | 27.4 | 19.2 | 17.6 | 0.4 | 0.0 | 6.6 |
| R20 | 130.50 | $4,078,963 | 5.92 | 83.0% | 117,442 | 85,072 | UNITI 95,139; MOX 25,470; ZAYO 22,805; AT&T 21,620; COGENT 21,567; LUMEN 7,715; FIBERLIGHT 7,058; SEGRA 2,423 | $7,500 | 1 (0, 1, 0) | 0 | Tier 3 rail 100 ft TTI railroad at PRIVATE ROAD (FRA 276631P) on Marsha Sharp Freeway $7,500 | $107,276 | 641,804 | 47,245 | 77,453 | 42,555 | 445,107 | 204,546 | 34,416 | 4,979 | 0.1% | 71.7 | 12.0 | 21.5 | 14.3 | 3.9 | 6.2 | 0.9 |

Soil footage per kept route (ft):

| Route | Soil 1 | Soil 2 | Soil 3 | Soil 4 | Soil 5 | Soil 6 | Soil 7 | Soil 10 | Soil 12 | Flagged ft |
|---|---|---|---|---|---|---|---|---|---|---|
| R01 | 11,976 | 467,678 | 23,765 | 2,207 | 0 | 2,147 | 3,496 | 0 | 4,039 | 4,039 |
| R02 | 15,344 | 480,967 | 25,619 | 4,993 | 0 | 2,147 | 3,496 | 0 | 5,418 | 5,418 |
| R03 | 22,467 | 474,430 | 37,356 | 4,817 | 0 | 0 | 850 | 0 | 4,605 | 4,605 |
| R04 | 7,938 | 493,389 | 27,237 | 6,654 | 0 | 3,298 | 1,149 | 0 | 4,025 | 4,025 |
| R05 | 22,467 | 500,124 | 23,398 | 7,253 | 0 | 0 | 850 | 0 | 5,169 | 5,169 |
| R06 | 17,548 | 503,696 | 22,755 | 2,542 | 197 | 2,147 | 3,496 | 0 | 4,390 | 4,390 |
| R07 | 18,139 | 494,381 | 34,647 | 7,329 | 0 | 495 | 2,896 | 0 | 4,873 | 4,873 |
| R08 | 9,032 | 511,616 | 32,141 | 2,646 | 0 | 3,298 | 1,149 | 0 | 3,023 | 3,023 |
| R09 | 27,391 | 490,699 | 21,874 | 27,136 | 0 | 0 | 0 | 0 | 4,725 | 4,725 |
| R10 | 14,759 | 522,156 | 26,947 | 2,282 | 0 | 3,298 | 1,149 | 0 | 1,803 | 1,803 |
| R11 | 4,530 | 512,567 | 39,569 | 5,523 | 0 | 495 | 2,896 | 0 | 5,299 | 5,139 |
| R12 | 32,609 | 520,100 | 19,104 | 7,051 | 0 | 0 | 0 | 0 | 5,342 | 5,342 |
| R13 | 24,482 | 503,267 | 44,851 | 3,892 | 0 | 3,298 | 1,149 | 0 | 785 | 785 |
| R14 | 9,273 | 547,591 | 30,129 | 3,139 | 0 | 495 | 2,896 | 0 | 3,522 | 3,522 |
| R15 | 1,648 | 554,634 | 56,124 | 4,254 | 0 | 0 | 0 | 0 | 2,444 | 2,444 |
| R16 | 25,109 | 569,122 | 13,840 | 4,781 | 197 | 0 | 850 | 399 | 3,038 | 3,436 |
| R17 | 5,292 | 565,765 | 56,394 | 2,346 | 0 | 0 | 0 | 0 | 3,307 | 3,307 |
| R18 | 27,195 | 528,920 | 12,979 | 25,725 | 20,486 | 0 | 0 | 0 | 4,710 | 4,710 |
| R19 | 1,199 | 601,871 | 35,441 | 6,933 | 0 | 0 | 0 | 0 | 5,047 | 5,047 |
| R20 | 0 | 627,242 | 49,035 | 6,114 | 0 | 1,648 | 0 | 0 | 5,009 | 5,009 |

Every crossing priced at a tier on the cheapest route (R01):

None.

Solve log (every iteration):

| Iter | Solve s | Miles | Dollars | Max overlap vs kept | Result |
|--:|--:|--:|--:|--:|:--|
| 1 | 0.051 | 97.6 | $3,350,327 | 0.0% | kept |
| 2 | 0.051 | 102.97 | $3,465,505 | 0.0% | kept |
| 3 | 0.065 | 103.13 | $3,264,106 | 8.0% | kept |
| 4 | 0.18 | 101.89 | $3,370,638 | 12.9% | kept |
| 5 | 0.057 | 106.58 | $3,468,800 | 11.8% | kept |
| 6 | 0.054 | 105.92 | $3,246,558 | 24.2% | kept |
| 7 | 0.056 | 108.41 | $3,586,865 | 19.3% | kept |
| 8 | 0.184 | 119.91 | $3,705,428 | 0.6% | kept |
| 9 | 0.057 | 105.45 | $3,436,193 | 16.7% | kept |
| 10 | 0.052 | 117.25 | $3,676,054 | 13.0% | kept |
| 11 | 0.051 | 108.3 | $3,539,545 | 12.9% | kept |
| 12 | 0.05 | 106.61 | $3,486,332 | 24.2% | kept |
| 13 | 0.204 | 113.08 | $3,998,713 | 10.3% | kept |
| 14 | 0.054 | 130.5 | $4,078,963 | 4.6% | kept |
| 15 | 0.061 | 110.65 | $3,636,722 | 21.1% | kept |
| 16 | 0.057 | 116.92 | $3,791,371 | 14.4% | kept |
| 17 | 0.052 | 123.2 | $4,068,865 | 20.7% | kept |
| 18 | 0.19 | 110.18 | $3,873,709 | 18.4% | kept |
| 19 | 0.075 | 108.12 | $3,767,163 | 14.1% | kept |
| 20 | 0.066 | 133.79 | $4,267,360 | 22.5% | detour cap |
| 21 | 0.061 | 117.43 | $4,026,892 | 27.6% | kept |

## Comparison only, never a target: the human route and the bid, like for like

- The KMZ line was sampled every 50 ft (11,241 samples) for soils, places, pavement and the nearest HPMS segment; each sample took the OSM class and toll flag of the nearest corridor-graph sample point within 30 m (97.2% matched; the rest priced as unclassified county road).  Crossings on the human route are those of the 195 graph edges it runs along (549,276 ft of edges; an edge counts when at least 2 samples and 30 percent of its own sample count land on it).
- Inside-place footage 47,947 ft (Lubbock city 39,847 ft, Floydada city 7,600 ft, Petersburg city 500 ft); metro footage (pavement 10 percent or more) 39,047 ft; mean neighborhood pavement 4.9 percent (centerline cell 17.1); permit class footage state_dot 419,073 ft, county 105,593 ft, municipal 36,998 ft, interstate 350 ft.
- **Tool price of the human route at the bid's own rates: $3,511,786** (6.25 per ft): soil $3,351,716, crossings $0 (0 tiered: {}, {}), permitting adder $160,070; bore 56,446 ft, trench 505,567 ft.  At template defaults (base $12.00): $3,930,078.
- **Bid underground construction lines (footage times unit cost, `CONSTRUCTION LABOR BID` rows under the footage and unit cost headers, segment column H): $3,217,266 for 562,013 ft.**  spiderplow 330,448 ft $1,321,790; trench 149,765 ft $857,736; bore 81,210 ft $996,440; crossing 590 ft $41,300.
- Plow convention: the tool prices every not-bore foot at the trench rate (Jeff, 2026-09-21).  The bid's plow lines repriced at this project's trench rates add $338,827 (SPIDERPLOW - CLASS 1 - SAND 8,253 ft at $4 plow versus $5 trench; SPIDERPLOW - CLASS 2 - DIRT 306,166 ft at $4 plow versus $5 trench; SPIDERPLOW - CLASS 3 - CLAYS 14,353 ft at $4 plow versus $5 trench; SPIDERPLOW - CLASS 4 - COBBLE 1,676 ft at $4 plow versus $10 trench), so the bid's own footage at the tool's convention is $3,556,092.
- **Ratios: tool over bid comparable 1.092; tool over bid-at-tool-convention 0.988; tool over construction labor K 0.486; tool over bid total P 0.209.**  Within 10 percent of the comparable underground number: yes.  Footage: tool bore 56,446 ft (bid bore plus tiered crossings 81,800 ft), tool not-bore 505,567 ft (bid plow plus trench 480,213 ft); tool tiered crossing footage 0 ft $0 versus the bid's crossing lines $41,300.
- Bid presentation for this segment (row 9, SEGMENT 1: TURKEY - S. CAV - LUBBOCK): LF 562,013, construction labor K $7,233,107, materials O $8,120,658, total P $16,834,382.  Construction labor also holds handholes, splicing, restoration, traffic control and the like, which the tool does not price.
- **Human route diversity: 84.8%**; shared 85,544 ft, near band 20,299 ft, longest continuous shared run 49,297 ft, most carriers on one stretch 4; by carrier COGENT 50,797 ft, LUMEN 12,749 ft, AT&T 12,099 ft, FIBERLIGHT 11,599 ft, UNITI 10,299 ft, SEGRA 8,449 ft, MOX 1,900 ft, ZAYO 1,500 ft.
- Cheapest tool route R01 versus the human route: 97.60 mi versus 106.44 mi (ratio 0.917); $3,350,327 versus $3,511,786 by the same model and rates (ratio 0.954); diversity 66.9% versus 84.8%.

| Soil class | Tool sample of the human line (ft) | Bid calculator soils block (ft) |
|--:|--:|--:|
| 1 | 12,099 | 12,602 |
| 2 | 515,066 | 501,919 |
| 3 | 22,049 | 21,666 |
| 4 | 2,350 | 3,146 |
| 5 | 0 | 2,005 |
| 6 | 2,150 | 3,636 |
| 7 | 3,500 | 3,199 |
| 11 | 0 | 1,693 |
| 12 | 4,800 | 12,147 |

## Still placeholder (all marked in assumptions_defaults.json)

- Metro multipliers (1.0, 1.15, 1.4, 2.0 by pavement bin) and permitting adders (county 0, state DOT 0.05, municipal 0.15, interstate 0.5, toll 0.75, federal or tribal 0.5, in multiples of dirt bore per foot) are Claude's placeholders until step 4 calibration.  The data behind them is now real.
- Crossing default lengths (perennial flowline with no bridge 100 ft, FRA at-grade rail 100 ft) and the rule that minor flowlines without a bridge are not tiered are Claude's interim choices; the tier rates and the calculator's three tiers are Jeff's.
- Soil classes 10, 11, 12 are priced as class 3 and their footage is reported as flagged.  Plow rows are unused; not-bore uses the trench multiples.
- Pipeline crossings (Big Springs priced 67,000 ft of them) have no data layer in the tool.

## What failed or was not checked

- Nothing failed in the run that produced this report (the report is written only after every step returned).
- Not checked: GeoTel positional accuracy; OSM bridge edges spanning the whole physical bridge; whether every FRA crossing sits within 30 m of its OSM road.
- The inside-place test uses the edge midpoint; the RoadAuthority join votes over three points per edge; the human line is tested per sample.
- The human route's crossings are taken from the graph edges it runs along, so a crossing on an edge the snap did not claim is missed, and its crossing footage is also priced once more as soil footage (small: 0 ft).

## Files

- `_Working\runs\turkey\routes.kmz`: one folder per kept route, A, Z, the human route (comparison only), shared segments, and tiered crossing points.
- `_Working\runs\turkey\explorer.html`: Leaflet map (routes, human route, shared segments, crossings), scatter, sortable table with permit and crossing columns, assumptions panel.  Needs internet for tiles and Leaflet.
- `_Working\runs\turkey\results.json`: every number in this report.  `bid_extract.json`: every bid line read, with cell addresses.  `run.log`: console log.
- `engine\projects\turkey\project.json` and `assumptions_overrides.json`.

- `_Working\runs\turkey\explorer-screenshot.png`: screenshot written (540,064 bytes) in 0.9 s; chrome exit 0.
